MUSCAT: The 14.5km link starts at the Al Batinah Expressway intersection and ends at the Al Khaboura Wilayat roundabout on the Al Batinah Main Road.
The project work includes raising efficiency of the existing road from a single to a double road with two lanes of traffic in each direction, with the construction of a number of box culverts to drain rainwater. It will provide the road with traffic safety requirements of concrete and metal barriers, guiding regulations and warning signs as per the standard specifications approved in the Oman Highway Design Manual.
The establishment of this link comes as part of the Ministry’s plan to activate the link between the Al Batinah Highway and the Al Batinah Expressway, by working to raise the efficiency of the existing road links or constructing new road links based on the results of traffic studies and the road matrix that is supervised by the Ministry of Transport, Communications and Information Technology.
Read More
- Sohar forum looks at how to put Oman’s climate plans into practice
- Oman allows hotels to keep expat receptionists on night shifts until June 2027
- Oman Chamber board to elect chairman on Nov. 29
- Oman’s education authority conducts follow-up visits to schools rated below satisfactory
- Oman’s Foreign Minister meets South Korean Prime Minister to discuss trade and investment ties





