MUSCAT : The Public Services Regulatory Authority has issued clear directives to assess all electricity networks situated in valley paths and implement high-quality projects to redirect and redesign them, aiming to enhance safety, reliability, and long-term performance.
Engineer Alaa bin Hassan bin Moussa, CEO of Namaa Electricity Distribution Company, stated that all electrical lines within valleys have been thoroughly studied and are currently in the design phase. These networks will be rebuilt to higher technical standards to improve efficiency and ensure durability against natural conditions such as heavy rainfall and flash floods.
Among the key projects underway is the development of the electrical network in Wadi Fida in Al Dhahirah Governorate. The initiative addresses challenges caused by concrete poles positioned within the valley’s path, which, despite their strength, remain vulnerable to damage during flash floods. As part of the upgrade, these will be replaced with iron poles strategically placed along the valley, reducing weather-related risks and ensuring continuity of service in affected areas.
Read More
- Oman unites for a cause, raising more than RO 1.5 million for medical treatment of two children
- His Majesty Sultan Haitham meets UK PM in London, discusses regional security and maritime navigation
- Oman Air touches down in Singapore with new direct route
- Air India Express restores Salalah services, reconnects full west Asia network
- Oman’s CPA seizes illicit cigarettes, chewing tobacco in crackdown on violating expat workers and street vendors
The CEO confirmed that more than RO 30 million has been allocated for these projects, covering the relocation of affected infrastructure, strengthening of the electrical system, and the implementation of additional projects including new network developments and station construction.
Looking ahead, Oman is also advancing strategic projects to diversify energy sources, with a strong focus on renewable energy, particularly wind power. These projects are expected to generate between 5,500 and 6,500 megawatts, accounting for over 50 percent of the Sultanate’s current electricity production capacity.
In total, the upcoming phase of infrastructure development across electricity, gas transmission, water, and sanitation sectors is projected to exceed RO 8 billion.
For all the latest news from Oman and GCC, follow us on Twitter, Instagram and LinkedIn, like us on Facebook and subscribe to our YouTube page, which is updated daily.





