Muscat – At an estimated cost of OMR 3 million, the Dhank Road dualization project entails constructing a dual carriageway supplemented by a roundabout and service roads flanking both sides. Additionally, the initiative will encompass the surfacing of secondary roads, aiming to enhance connectivity and traffic efficiency in the region.
Scheduled to span until late November, this ambitious project seeks to optimize traffic flow consistently and foster developmental connectivity between neighbouring areas. With an emphasis on shortening travel distances and serving adjacent residential and urban localities, the initiative aims to streamline movement and spur localized growth.
Simultaneously, the municipality remains committed to paving secondary roads within the state, alongside the ongoing repair and maintenance efforts along the Aqaba mountain road. These actions are imperative, especially after certain sections suffer disruptions due to adverse climatic conditions, ensuring safer and more accessible routes for commuters.
Read More
- Oman rolls out diesel subsidy cards from Dec. 1, keeps rate at 258 baisa a litre
- His Majesty Sultan Haitham sends letter to Pakistan PM Shehbaz Sharif
- Oman draws up licensing rules for IT firms as regulator’s remit expands
- Oman sets fines of up to OMR 30,000 under new rules on promotional calls and texts
- Oman, Japan stress maritime security in Tokyo talks





