MUSCAT – The road repair project included leveling ‘dirt shoulders’ with a length of 60 kms, and implementing nine valley crossings and a number of ‘box culverts’ in five locations. The implementation of road repair works is taken into account as per the standard specifications approved in the Road Design Manual, and with traffic safety requirements based on the regulations.
Read More
- Oman records highest temperature of 46.2°C
- Heavy rain and hail lash Oman’s Al Buraimi, triggering wadi flows
- Honourable Lady visits Omani Women’s Association in Salalah
- Oman Foreign Minister holds talks with Tunisia, Brunei on bilateral ties and global developments
- Oman, Kazakhstan review bilateral ties and regional developments





